Category
Ajankohtaista

13.9.2019
Under-frequency load shedding is the power system’s final option
Fingrid is currently responsible for arranging under-frequency control, but this responsibility will be spread more widely. In the future, distribution network operators and industrial operators connected to the transmission system will be responsible for under-frequency load shedding. These parties need to get themselves up to speed now, as all changes must be made by the end of 2022.